Skip to main content

New tender for section of A4 highway in Poland

A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia.
August 24, 2012 Read time: 1 min
A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland.

The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of 3206 Hydrobudowa, 6461 SIAC Construction, PBG, and 6462 Aprivia.

GDDKiA are reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDDKiA pays it €165.33 million (PLN 675mn).

Earmarked to stretch 670km from the Polish-German border in Zgorzelec, through Wrocław, Katowice, Kraków, Tarnów, and Rzeszów, to the Polish-Ukrainian border at Korczowa, the A4 is due for completion in 2013.

Related Content

  • Poland boosts road maintenance for 2025
    September 25, 2024
    Around 1.1% of the total length of national roads underwent repair and reconstruction at the end of 2023.
  • Mombasa-Tanga link faces delays over design changes
    April 10, 2018
    Kenya has blamed design changes for delaying the start of work on a road linking the port of Mombasa to the Tansanian port of Tanga. The change to the key road’s design is from a single to dual carriageway along a section of the 445km transnational highway. However, the African Development Bank (AfDB), the principal financier of the project, said the Kenyan government itself was slow in completing preliminary studies, such as road designs, in order to start construction.
  • Sao Paulo’s Mario Covas ring road faces last section glitch
    April 10, 2015
    A consortium of Brazil's Mendes Junior and Spain's Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo. The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.
  • EU to co-finance studies for new northern Greek highway
    March 19, 2014
    The European Union is to help finance studies for the northern border section of the Ionian Highway in Greece. Some €1.56 million is being provided through the TEN-T Programme to help pay for a series of studies required to prepare for the project’s tender process. The studies will cost some €3.12 million in all and related to a 46km stretch of highway connecting the Egnatia Odos-Ionian Highway interchange and Kakavia.The initiative was selected for funding under the 2012 TEN-T Annual Call and includes carr