Skip to main content

New tender for section of A4 highway in Poland

A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia.
August 24, 2012 Read time: 1 min
A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland.

The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of 3206 Hydrobudowa, 6461 SIAC Construction, PBG, and 6462 Aprivia.

GDDKiA are reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDDKiA pays it €165.33 million (PLN 675mn).

Earmarked to stretch 670km from the Polish-German border in Zgorzelec, through Wrocław, Katowice, Kraków, Tarnów, and Rzeszów, to the Polish-Ukrainian border at Korczowa, the A4 is due for completion in 2013.

Related Content

  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Czech road project awards and tender
    July 19, 2024
    Czech road projects have been awarded, with another due to open for tender.