Skip to main content

New technology set to cut UK roadworks red tape

New technology is being brought in to make it easier for local councils and utility companies in England and Wales to manage roadworks. Coming into force on 1 October 2013, the electronic changes will modernise the way roadworks are co-ordinated and administered, making it easier and quicker for councils and utility companies to share information. The new technology will mean that more information on the timing and co-ordination of road works can be stored on a single computer system. “Nobody likes having
April 9, 2013 Read time: 2 mins
New technology is being brought in to make it easier for local councils and utility companies in England and Wales to manage roadworks.

Coming into force on 1 October 2013, the electronic changes will modernise the way roadworks are co-ordinated and administered, making it easier and quicker for councils and utility companies to share information. The new technology will mean that more information on the timing and co-ordination of road works can be stored on a single computer system.

“Nobody likes having their journey disrupted by roadworks,” said local transport minister Norman Baker. “By cutting red tape and making it easier for councils and utility companies to work together, roadwork can be carried out more efficiently, with considerable savings made to the public purse. This will free up time and resources that could be better spent delivering other services that will benefit road users in the future.”

It is estimated that about two thousand hours could be saved by councils and utility companies every week by using the new system, saving industry alone €706,256 (£600,000 a year). In total, the street works sector is expected to net savings of €16.83million (£14.3mn) over the next 10 years, driving efficiencies and saving taxpayers’ money.

All councils and utility companies will be legally bound to use the new system - known as the Electronic Transfer of Notices (or EToN) system -, when legislation comes into force later this year. Councils and utility companies will be given a six month window to move over to the new system, with all councils expected to be using the new technology by 1 April 2014.

Related Content

  • Eradicating work zone danger
    June 26, 2013
    New safety systems for highway work zones are helping to reduce deaths and injuries in the United States, while much work is being done in Europe to improve work zone safety. Guy Woodford reports. With more road building underway than at any one time in Texas history, the US Lone Star state’s Department of Transportation (TxDOT) is introducing its first highway safety system with queue-warning technology and temporary rumble strips to cut work zone collisions. Debuting along a central Texas stretch of the
  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours
  • Portsmouth bridge gets cash boost
    December 17, 2012
    Major improvements are planned to tackle a traffic bottleneck on the Northern Road Bridge in Portsmouth, on the English south coast, after the government pledged €13.73 million [£11 million] for the project. The Department for Transport has given final approval to the scheme which will see work on a replacement bridge over the Portsmouth to London railway line at Cosham. The original bridge was built to carry a dual carriageway road but is now too weak to do so. Traffic has been restricted to a single lane
  • Atlas Copco attachments make short work of the A8 Blaubeurer Weg Bridge
    March 21, 2016
    A reinforced concrete bridge over the Autobahn 8 between Merklingen and Nellingen in southern Germany was demolished overnight due in no small part to the efficient, reliable performance of Atlas Copco hydraulic attachments. In addition to demolition grippers, breakers and pulverisers, the demolition team used the HM 2000 hydraulic magnet to demolish structures and sort demolition waste. There is now nothing to stop the widening of the A8 to six lanes or construction of the parallel high-speed Wendlingen