Skip to main content

New runway built on remote island

The first plane has already landed at the new airport built on the remote island of St Helena - with the help of machines from Volvo CE. Flights are now landing regularly on St Helena, one of the most remote inhabited islands in the world, a decade after the airport was announced. The first aircraft to use the new facility was a Beechcraft King Air 200, having flown from Johannesburg, South Africa, refuelling in Angola for the four-and-a-half hour flight across the Atlantic. The Beechcrft King Air come
June 7, 2016 Read time: 2 mins
A new runway was built using Volvo CE machines on the remote island of St Helena
The first plane has already landed at the new airport built on the remote island of St Helena - with the help of machines from 359 Volvo CE

Flights are now landing regularly on St Helena, one of the most remote inhabited islands in the world, a decade after the airport was announced. The first aircraft to use the new facility was a Beechcraft King Air 200, having flown from Johannesburg, South Africa, refuelling in Angola for the four-and-a-half hour flight across the Atlantic.  

The Beechcrft King Air comes in to land on the runway, built by a fleet of Volvo CE machines. The test flight ends 500 years of isolation for St Helena, set in the middle of the South Atlantic Ocean and until now only accessible by sea. Its only lifeline to the outside world were the monthly visits of RMS St Helena, a British Royal Mail ship, soon to be decommissioned, which sails up from South Africa.

Built by South African construction giant Basil Read, the airport on St Helena will open to commercial flights later this month. The company had to bring in all of the construction equipment by sea and the first machine to drive on to the island was a Volvo G940B motor grader. Another 65 Volvo units later followed, including EC700C crawler excavators, A40F-FS and A30E articulated haulers, EW140C wheeled excavators, DD24 and SD200DX compactors, EC380 and EC480 crawler excavators, and an MC115C skid steer loader, as well as more motor graders.  

Basil Read’s Island director Deon De Jager and his wife Chrezelda were among those welcoming the test flight, witnessed by hundreds of islanders who had gathered to watch the historic landing.

Related Content

  • Chepstow's Volvo order
    February 16, 2012
    UK company Chepstow Plant (International) has placed orders for a further 40 Volvo Construction Equipment units in 2011.
  • Volvo machines facilitate German highway construction project
    August 15, 2014
    German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways. The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads. Gebrüder Bantle
  • Improved airport for Thimarafushi atoll
    August 29, 2014
    Thimarafushi forms part of the Thaa Atoll lying in the Indian Ocean but access has been limited in the past. However the construction of a new airport planned by the Maldives Government will help develop the tourist trade, boosting the local economy. Most visitors previously used the country’s two international airports, using these as hubs for flights to the country’s six domestic airports. This has limited travel to only a few of the country’s 1,192 islands, of which around 200 are inhabited. As a result,
  • UAE quarry facility boosting productivity
    May 15, 2015
    A United Arab Emirates quarry is putting its Volvo fleet to the test in harsh conditions A quarrying facility in the United Arab Emirates (UAE), is boosting output following the commissioning of a new machine fleet for loading and hauling duties. The quarry is located in the northeast of the UAE in Fujairah, an emirate almost entirely surrounded by mountains. This rugged landscape is the product of an estimated 800 million years of geological activity and is the source of a high quality limestone used in