Skip to main content

Chepstow's Volvo order

UK company Chepstow Plant (International) has placed orders for a further 40 Volvo Construction Equipment units in 2011.
February 16, 2012 Read time: 2 mins
One of CPI's Perlini DP405 rigid dump trucks being loaded by a Volvo excavator
RSSUK company 2739 Chepstow Plant International has placed orders for a further 40 359 Volvo CE units in 2011.

In 2010, the company, based near Chepstow, County Monmouthshire, Wales, which specialises in long-term contracts with operated and non-operated plant, bought a total of 50 Volvo excavators, articulated haulers and loading shovels.

CPI, which specialises in high production projects in the UK and abroad, are also the first to have taken delivery of two 2740 Perlini DP405 rigid dump trucks since Volvo Construction Equipment Division in the UK became official dealers for the Perlini range of rigid haulers in June, 2010.

The majority of machines for 2011 consist of Volvo A25F and A40F articulated haulers with a mix of shovels and excavators ranging from EW160C (16tonnes) to the latest EC380D (38tonnes), the package being both a replacement programme as well as an increment to the CPI fleet of equipment.

To provide added value to CPI's customer base all Volvo-supplied products are equipped with CareTrack telematics utilising the latest technology in machine management. CareTrack provides operational data remotely via the Internet, including fuel consumption and idle time, all helping to reduce cost of ownership and maximise utilisation. All the Volvo equipment supplied to CPI during 2010 and for 2011 is covered under a Volvo Blue Customer Support Agreement.

For more information on companies in this article

Related Content

  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • UAE quarry facility boosting productivity
    May 15, 2015
    A United Arab Emirates quarry is putting its Volvo fleet to the test in harsh conditions A quarrying facility in the United Arab Emirates (UAE), is boosting output following the commissioning of a new machine fleet for loading and hauling duties. The quarry is located in the northeast of the UAE in Fujairah, an emirate almost entirely surrounded by mountains. This rugged landscape is the product of an estimated 800 million years of geological activity and is the source of a high quality limestone used in
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Volvo CE machines help construct and pave Polish highway
    December 17, 2013
    Polish contractors Salini Poland and PBDiM Kobylarnia are building a 64km section of the A1 highway between Toru (Northwest of Warsaw) and Kowale (just south of Gdansk on the Northern coast). This project will complete a key section of the highway and is being funded by the Polish road authority (GDDKiA). Worth some €107 million this is one of three schemes being undertaken by the consortium to complete the main A1 highway.