Skip to main content

New route slashes HGV Carlisle city centre through traffic by over third

The number of Heavy Goods Vehicles travelling through Carlisle’s city centre is estimated to have been reduced by more than a third since the new multi-million euro Carlisle Northern Development Route opened in February 2012.
August 17, 2012 Read time: 3 mins
The number of Heavy Goods Vehicles travelling through Carlisle’s city centre is estimated to have been reduced by more than a third since the new multi-million euro Carlisle Northern Development Route opened in February 2012.

Information from a network of 20 permanent and temporary traffic counters around the city showing ‘before and after’ CNDR road usage is said to be starting to build a more meaningful picture of the impact the new road has had on Carlisle.

Detailed information from the traffic counters is now available via an interactive pin map on Cumbria County Council’s (CCC) website at %$Linker: External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.cumbria.gov.uk/cndr cumbria false http://www.cumbria.gov.uk/cndr false false%>
It shows a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles a day use the new 8.25km/5.13-mile road.

Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16% reduction in all vehicles from 38,083 a day before the opening of CNDR to 32,050 afterwards (with a 41% reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16% reduction in all vehicles and a 32% reduction in HGVs.

CNDR is said by CCC to have quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

As expected, there are higher levels of traffic on certain radial routes that have direct links to the CNDR. CCC says it has already set aside additional capital funding to counter this effect and also improve links to CNDR for pedestrians and cyclists along these radial routes.

A spokesperson for CCC warned that as road usage data can be skewed by a number of unrelated external factors, from the weather and the economy to what’s on telly, these new CNDR related figures need to be treated with an element of caution. Traffic engineers will carry out a more detailed traffic movement study later this year, which will also assess average journey times.

Councillor Tony Markley, Cumbria County Council's Cabinet member responsible for highways and economy, said: "Carlisle has embraced its new major road. Both commuters and industry in North Cumbria have quickly adjusted their travelling habits to get the full benefits from CNDR. This project has been a huge investment for the county council and one which will reap rewards for many years to come in terms of economic and environmental payback.”

Related Content

  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.
  • Global infrastructure spend remains stable but some regions decline
    August 23, 2018
    Spending on inland transport infrastructure – road, rail, waterways - showed minimal change in 2016, staying at 0.7% of GDP, according to data from the OECD. However, the latest data – analysed by the International Transport Forum - also shows a reversal of investment per Gross Domestic Product (GDP) for Australasia, Central and Eastern Europe and Russia. The data is from a report by the Paris-based OECD – Organisation for Economic Co-operation and Development. Growth in inland infrastructure investme
  • Road accident data management
    July 19, 2012
    IRF Geneva unveils a modern solution for road accident data management. This year's Intertraffic Amsterdam exhibition provided a high-profile backdrop for the launch of RADaR, a pioneering new tablet application developed to facilitate the on-site collection of precise and scientific accident data, primarily by traffic police. Introducing the application to an international audience gathered in the venue’s inaugural Smart Mobility Centre, IRF Geneva's director general, Sibylle Rupprecht, highlighted RADaR's
  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    August 31, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap