Skip to main content

Mumbai Airport on the up

To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006. As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly u
August 24, 2012 Read time: 1 min
A Terex crane working at Mumbai Airport
To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006.

As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are 1222 Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly used to provide the workers with the steel and concrete needed to build the two structures.

Able to reach heights of nearly 30m and with 35m-long jibs, they can lift up to 10tonnes for the parking structure and 8tonnes for the tower.

The projects are scheduled for completion by December, 2013.

For more information on companies in this article

Related Content

  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Cleveland Bridge UK’s A14 work shortlisted
    July 15, 2020
    The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.
  • Stuttgart’s Rosenstein Tunnel to open in March
    March 1, 2022
    Cost of the project, part of a larger interchange plan for the German city, is around €416 million.
  • Cummins turbos launched at Conexpo 2014
    May 20, 2014
    Cummins develops new turbo technology to boost diesel efficiency and performance – Geoff Ashcroft reports Cummins Turbo Technologies (CTT), a global engineering leader in turbocharger technology, has revealed a new range of large turbochargers for engine capacities of 16litres and above. Called the 900 series, the new turbo platform sits between the 800 and 1000 series models and is said to provide robust, flexible solutions for the off-highway sectors, including quarrying and mining applications. Des