Skip to main content

Mott MacDonald’s passage to India

Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. T
April 24, 2012 Read time: 2 mins
2579 Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India.

Part of the National Highways Development Programme Phase IV established by the 292 National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda.

Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. The works will include design of four major and 19 minor bridges, a railway over-bridge, three flyovers, 22 vehicular and nine pedestrian underpasses, 172 culverts, 18 major junctions, 15 bus bays, two truck lay-bys, three toll plazas and 25km of retaining walls.

Appointed by 1318 IVRCL Raipur-Bilaspur Tollways, Mott MacDonald will be responsible for the engineering and detailed design of the project, which will facilitate transport of raw materials like iron ore, limestone, dolomite, bauxite and coal to core industries thriving in the region. The stretch will also improve connectivity of industrially developing areas like Bilaspur, Raigarh and Jarsuguda.

Commenting on securing the design consultancy for national highway 200 Srinivasa Chari, Mott MacDonald’s project director, said: “With proven experience in managing major transport projects, we are uniquely placed to deliver this strategic highway and in particular are looking forward to the challenges of designing the new 550m long two lane bridge over the River Sivnath.”

Mott MacDonald has successfully completed bridge projects for IVRCL in the past. The project is due for completion in July 2014.

For more information on companies in this article

Related Content

  • Spencer wins Menai Suspension Bridge refurb
    September 16, 2022
    The UK contract, worth nearly €1.8 million, is to repaint the entire main span underdeck of the 417m-long bridge, the second oldest operational vehicular suspension bridge in the world.
  • India spending on improving safety of roads
    January 14, 2016
    The Indian Government is looking to upgrade its road links and also improve the condition of many road links right across the country, with a view to improving safety, as well as transportation. A series of infrastructure plans are being implemented, aimed at improving road conditions in the country. India’s Ministry for Road Transport and Highways is keen to improve road safety and reduce the fatality rate in the country. The Indian Government is establishing a Road Safety Authority that is being charged
  • Highway deals for three Indian states
    April 24, 2012
    The authorities in India have given the go-ahead for a series of highway projects in the states of Tamil Nadu, Orissa and Rajasthan. These will be worth US$693.5 million and are being planned under the design, build, operate, finance and transfer (DBOFT) model. The National Highways Development Project (NHDP) will see upgrades to the Madurai-Ramanathapuram route in Tamil Nadu, the Chandikhole-Dubari-Talcher road in Orissa to four-lane section and a 79km section of the Gomati Chauraha-Udaipur road in Rajasth
  • Road improvements for India's capital
    February 20, 2012
    Delhi is to benefit from nine road upgrade projects worth a total of over US$155 million.