Skip to main content

Mott MacDonald’s passage to India

Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. T
April 24, 2012 Read time: 2 mins
2579 Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India.

Part of the National Highways Development Programme Phase IV established by the 292 National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda.

Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. The works will include design of four major and 19 minor bridges, a railway over-bridge, three flyovers, 22 vehicular and nine pedestrian underpasses, 172 culverts, 18 major junctions, 15 bus bays, two truck lay-bys, three toll plazas and 25km of retaining walls.

Appointed by 1318 IVRCL Raipur-Bilaspur Tollways, Mott MacDonald will be responsible for the engineering and detailed design of the project, which will facilitate transport of raw materials like iron ore, limestone, dolomite, bauxite and coal to core industries thriving in the region. The stretch will also improve connectivity of industrially developing areas like Bilaspur, Raigarh and Jarsuguda.

Commenting on securing the design consultancy for national highway 200 Srinivasa Chari, Mott MacDonald’s project director, said: “With proven experience in managing major transport projects, we are uniquely placed to deliver this strategic highway and in particular are looking forward to the challenges of designing the new 550m long two lane bridge over the River Sivnath.”

Mott MacDonald has successfully completed bridge projects for IVRCL in the past. The project is due for completion in July 2014.

For more information on companies in this article

Related Content

  • India’s key bridge project
    December 21, 2018
    Plans are now being drawn up in India for the new Ganga River bridge crossing project. Costing US$395.3 million, the project has now been given the necessary approval by India’s prime minister. Construction is expected to take 40 months once work is underway, with completion due in 2023. The main bridge will measure 5,634m however the work includes building a 1,580m viaduct, 13 interchanges, four smaller bridges and a 110m flyover. It also includes four vehicular underpasses and a rail over bridge.
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.
  • India road project tenders open for bids
    October 16, 2017
    The tender process will remain open for nine major highway projects in India until the 9th January 2018. These are all for national highway projects, with the work being managed by the National Highways Authority of India (NHAI). The roads will measure a total of 700km and will be constructed in Andra Pradesh State and Gujarat State. These new tolled highways will be constructed and operated under the build-operate-transfer system.
  • Road tolling is vital for good roads
    January 2, 2024
    Upcoming transportation projects are outlined in planning documents throughout America by Mary Scott Nabers