Skip to main content

Mott Macdonald handling major Hong Kong project

Engineering firm Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s bu
July 24, 2012 Read time: 2 mins
Engineering firm 2579 Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s busiest shipping channels. The bridge will be constructed using the balanced cantilever method and will be formed from pre-stressed concrete box sections. Mott MacDonald is to design a substantial section of the viaduct, as well as being responsible overall for geotechnical, highways, electrical and mechanical, utilities, and other civil engineering services. Dr Mark Swales, Mott MacDonald’s transport division manager in Hong Kong said, “The project will enable us to showcase and draw upon our world-wide experience in the design of major bridges; it will be both challenging and rewarding for all.”

For more information on companies in this article

Related Content

  • Mott MacDonald to upgrade major west Spain highway
    July 17, 2013
    Mott MacDonald (MM) has been appointed by Sociedad Concesionaria Autovía de la Plata as lender’s technical advisor for a major highway upgrade in western Spain. The project involves the design, construction, maintenance, operation and finance of a 49km two-lane dual carriageway between Benavente and Zamora. The new road, which will bypass the existing single carriageway through local villages, will form the last section of the 809km A-66 Autovía de la Plata highway, connecting Gijon in the north to Seville
  • Tunnelling conference and competition
    September 23, 2019
    The annual tunnelling conference and competition is due to take place in Miami from the 18th-20th November in Miami, Florida. The competition features eight categories and aims to identify the most important ongoing underground works and technologies that help cities change and enable habits and ways of life to evolve in order to build smart and sustainable urba
  • Innovative sealing of world's longest immersed tunnel
    April 16, 2012
    Infrastructure has been chosen to provide a sealing system for the world's longest immersed tunnel. China Communications Construction is said to have selected Trelleborg for the innovative design of its seals, which are claimed to ensure watertightness even through a seismic event. Part of China's prestigious Hong Kong - Zhuhai - Macau link project, the immersed near 6km tunnel will consist of 32 elements. The joints will be sealed with a Trelleborg sealing system including Gina gaskets, Omega seals and wat
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.