Skip to main content

Mott Macdonald handling major Hong Kong project

Engineering firm Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s bu
July 24, 2012 Read time: 2 mins
Engineering firm 2579 Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s busiest shipping channels. The bridge will be constructed using the balanced cantilever method and will be formed from pre-stressed concrete box sections. Mott MacDonald is to design a substantial section of the viaduct, as well as being responsible overall for geotechnical, highways, electrical and mechanical, utilities, and other civil engineering services. Dr Mark Swales, Mott MacDonald’s transport division manager in Hong Kong said, “The project will enable us to showcase and draw upon our world-wide experience in the design of major bridges; it will be both challenging and rewarding for all.”

For more information on companies in this article

Related Content

  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Nigeria deal for Mott MacDonald
    April 25, 2012
    Consultant Mott MacDonald will carry out transportation planning for the development a new highway transport plan for the city of Jos in Nigeria's Plateau State.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • UK motorway bridge work
    June 10, 2025
    A new bridge now spans the UK’s busy M6 motorway.