Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • More output for less fuel from Atlas Weyhausen’s new E Series compact wheeled loaders
    January 6, 2017
    Atlas Weyhausen’s new E Series wheeled loaders will be on display at Bauma with the AR 65e, AR 75e, AR 80e and AR95e Super all on view. Using newly developed Deutz engines, the new wheeled loaders offer up to 12% more output with lower fuel consumption figures. A key design feature of the engines is that they do not contain a particle filter and therefore are easier to maintain, claims the German manufacturer. There is a new steering valve on the E Series too, allowing operators to run the machine electroni
  • More output for less fuel from Atlas Weyhausen’s new E Series compact wheeled loaders
    February 15, 2013
    Atlas Weyhausen’s new E Series wheeled loaders will be on display at Bauma with the AR 65e, AR 75e, AR 80e and AR95e Super all on view. Using newly developed Deutz engines, the new wheeled loaders offer up to 12% more output with lower fuel consumption figures. A key design feature of the engines is that they do not contain a particle filter and therefore are easier to maintain, claims the German manufacturer. There is a new steering valve on the E Series too, allowing operators to run the machine electroni
  • ENKA wins award for work on Kosovo highway project
    May 13, 2013
    Turkish contractor ENKA and its joint venture partner Bechtel have won the Best Global Project Award from US magazine Engineering News Record (ENR) for the Kosovo Route 7 highway project. The privately owned firm ENKA and Bechtel won an award in ENR’s Global Best Competition 2013 for the Project of the Year in the category for Roads and Highways around the world. Projects in several categories competed in the awards on factors such as innovation and overcoming global challenges, implementation of safety pro