Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • Crusher grapple showcased by Ramtec
    January 6, 2017
    Finland-based demolition machinery and linked attachment specialists Ramtec will showcase its Robi range CG20R crusher grapple at INTERMAT 2012.
  • Crusher grapple showcased by Ramtec
    February 3, 2012
    Finland-based demolition machinery and linked attachment specialists Ramtec will showcase its Robi range CG20R crusher grapple at INTERMAT 2012.
  • Our new screening buckets won’t clog, says Allu
    January 6, 2017
    Allu has added three new models to its range of screening buckets. The Allu DL series has been designed for excavators between 4 and 12tonnes and loaders between 2 and 8tonnes. The design of the DL series bucket’s top screen ensures that it won’t clog, even with wet materials, according to the manufacturer. The screening blades and top screens can be changed to vary the size of the end product, which is dependent on the spacing between the combs.
  • Our new screening buckets won’t clog, says Allu
    April 22, 2013
    Allu has added three new models to its range of screening buckets. The Allu DL series has been designed for excavators between 4 and 12tonnes and loaders between 2 and 8tonnes. The design of the DL series bucket’s top screen ensures that it won’t clog, even with wet materials, according to the manufacturer. The screening blades and top screens can be changed to vary the size of the end product, which is dependent on the spacing between the combs.