Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    January 6, 2017
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre
  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    April 18, 2013
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre
  • ZF chooses radial motor technology for its hydrostatic transmission
    January 6, 2017
    ZF has chosen a pair of radial hydraulic motors for use in its compact single-speed hydrostatic transmission, the 2HC85, which has been developed for compact wheeled loaders up to 100kW and 10.5tonnes operating weight. For high-torque start-up, the transmission sends oil to both motors and demands maximum stroke to travel from 0-16kph, before isolating one motor and then using 100% oil flow through the remaining motor to propel the machine to its maximum travel speed of 42kph. ZF said radial motors afford a
  • ZF chooses radial motor technology for its hydrostatic transmission
    April 18, 2013
    ZF has chosen a pair of radial hydraulic motors for use in its compact single-speed hydrostatic transmission, the 2HC85, which has been developed for compact wheeled loaders up to 100kW and 10.5tonnes operating weight. For high-torque start-up, the transmission sends oil to both motors and demands maximum stroke to travel from 0-16kph, before isolating one motor and then using 100% oil flow through the remaining motor to propel the machine to its maximum travel speed of 42kph. ZF said radial motors afford a