Skip to main content

Mexico's cable-stayed bridge highest in the world

Mexico’s newly opened Baluarte Bridge crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. The 1.12km long bridge is 403m high at its central point, making it the highest cable-stayed structure in the world, and a Guinness Book of Records entrant. It is part of a new highway connecting Mazatlan on Mexico’s Pacific Coast with Durango.
May 11, 2012 Read time: 1 min
Mexico’s newly opened Baluarte Bridge crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. The 1.12km long bridge is 403m high at its central point, making it the highest cable-stayed structure in the world, and a Guinness Book of Records entrant. It is part of a new highway connecting Mazatlan on Mexico’s Pacific Coast with Durango.

Related Content

  • Russia and Azerbaijan move closer to a new Samur River Bridge
    June 4, 2015
    Moscow-based infrastructure group Doraeroproekt Institute will design a bridge over the Samur River under an agreement between Russia and Azerbaijan. The new bridge will carry around 37,000 vehicles a day and link the two villages of Samur in Azerbaijan and the Russian village of Yarag-Kazmalar. The announcement follows the signing by the two governments of a bridge protocol in mid-2013 as part of other infrastructure project agreements. Azerbaijan will finance bridge construction and Russia will c
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Turkmenistan’s new bridge features novel waterproofing
    November 8, 2017
    Turkmenistan’s new bridge is benefiting from a novel sealing system that will optimise working life as well as maximising safety. A novel waterproofing solution is being utilised for the Turkmenabat - Farap Bridge in Turkmenistan. The project is of note as the structure is the longest metal span bridge in Central Asia. The client for the project is the state-owned firm Turkmenavtohowayollary, while the general contractor is Altcom Road Construction and the consultant engineer is Soyuztransproekt. Stirling
  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.