Skip to main content

Loadrite introduces its 360° load-out management system

The new Loadrite 360° management system has been designed to boost efficiency in quarries by integrating communication across all stages of an order for faster turnarounds and maximised payloads. Loadrite said that the system improves communication throughout the load-out operations. It is aimed at providing quarry managers with the tools they need to get the most from both staff and equipment. Benefits include lower costs per tonne and optimised truck utilisation, said the company.
April 18, 2013 Read time: 1 min
The new 5004 Loadrite 360° management system has been designed to boost efficiency in quarries by integrating communication across all stages of an order for faster turnarounds and maximised payloads.

Loadrite said that the system improves communication throughout the load-out operations. It is aimed at providing quarry managers with the tools they need to get the most from both staff and equipment. Benefits include lower costs per tonne and optimised truck utilisation, said the company.

Loadrite 360° integrates with the existing ticketing system and there is an automated communication link between the weighbridge and the loaders. It handles every step, right from the customer placing the order and it being entered into the system. The system also provides real-time visibility of traffic on the site and feedback on the accuracy of loads. It can also be used to study historical analysis and produce reporting of key performance indicators.

Stand: C2.121

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12839 0 oLinkExternal www.LoadriteScales.com www.LoadriteScales.com false /EasySiteWeb/GatewayLink.aspx?alId=12839 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Simex exports secrets behind company success
    January 6, 2017
    With a production of some 2,000 units in 2012 subdivided into 65 models produced in more than 210 versions, Simex today exports about 80% of its own production. Born in 1991 in San Giovanni in Persiceto, Emilia Romagna, the company soon set about achieving its goal of manufacturing high quality equipment for earth moving prime movers. Starting with asphalt planers for backhoe loaders, asphalt and concrete planers were soon manufactured by Simex for skid steer loaders too.
  • Simex exports secrets behind company success
    April 8, 2013
    With a production of some 2,000 units in 2012 subdivided into 65 models produced in more than 210 versions, Simex today exports about 80% of its own production. Born in 1991 in San Giovanni in Persiceto, Emilia Romagna, the company soon set about achieving its goal of manufacturing high quality equipment for earth moving prime movers. Starting with asphalt planers for backhoe loaders, asphalt and concrete planers were soon manufactured by Simex for skid steer loaders too.
  • Bell launches high-manoeuvrability 4x4 ADT for narrow bench work
    April 15, 2013
    Bell has introduced a 4x4 version of its B30D articulated dump truck (ADT). The machine has the front chassis, cab and engine of the standard 6x6 but comes with a shortened rear chassis and a single axle. According to Neville Paynter, managing director of Bell UK, the machine’s short wheelbase reduces the turning circle by around 25%, making it ideal for use in underground mining and on narrow benches.
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade