Skip to main content

Laos link on track

Work on a new road in Laos will take until 2012 to complete
March 1, 2012 Read time: 1 min
Work on a new road in Laos will take until 2012 to complete. The 278km road will connect Vientiane through Borikhamxay to Xieng Khuang. The project is costing US$130 million and work commenced in October 2008. At present around 76% of the project has been carried out and work is due to start on the last two of the 18 bridges in total along the new route.

Related Content

  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Two major Indian highway links under construction
    July 21, 2022
    Two major Indian highway links are under construction.
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • Paraguay’s plan for road rebuilding
    September 30, 2015
    Paraguay’s Ministry of Public Works and Communications (MOPC) will award a series of road projects worth around US$1.3 billion in early 2016. These project include work on the first section of the bi-oceanic corridor, the reconstruction of Route 9, the expansion of Routes 2 and 7 and the second bridge connecting Paraguay with Brazil. The tender process for Route 9 from Remanso Bridge to the city of Mariscal Estigarribia will open shortly and the project is expected to cost around $380 million. The tender fo