Skip to main content

Kruse and Volda win avalanche work

The deal, in western Norway, comprises a 4.8km tunnel and a 25m bridge.
By David Arminas September 22, 2020 Read time: 1 min
Preparation work next to tunnel and rig area in Indreeide (photo: Møre og Romsdal County municipality)

Kruse Smith Entreprenør and Volda Maskin have secured a contract with Norway’s Møre and Romsdal County Municipality for an avalanche protection system including a tunnel.

The project, along county road 63 between Eidsdal and Geiranger, comprises a 4.8km tunnel, 100m of tunnel portal work, a 25m bridge and a 135-metre-long landslide/avalanche protection wall, as well as all electrical installations.

The contract is for around €54.27 million with construction to start this autumn and completion in autumn 2023. The winning bid was also the lowest, noted project owner Arne Ola Stavseng, with Møre og Romsdal county. The highest bid was just more than €70 million, according to local media.

The tunnel will make county road 63 safer during the winter and reduce the number of closures.

Around 260,000 people live in the coastal county found on the northernmost part of Western Norway. Up to 630 vehicles use the road daily but the number can be as high as 1,500 during the busiest part of the tourist season.

Related Content

  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • British Columbia decides on Massey Tunnel
    August 20, 2021
    Canada’s Pacific coast province of British Columbia has announced the George Massey Tunnel replacement will be another tunnel and not a bridge as decided earlier.
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl