Skip to main content

Jakarta gets ‘vehicle-free’ streets on Sunday mornings

All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels. The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.
May 17, 2012 Read time: 1 min
All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels.

The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.

Related Content

  • Switzerland's road safety cultural divide
    February 27, 2012
    A study by Switzerland's Accident Prevention Office (BPA) has unveiled an interesting cultural phenomenon with regard to road safety.
  • Innovative Q-Free electronic enforcement system planned for Jakarta
    March 1, 2012
    PT Rin and Q-Free have signed a contract for delivery of an electronic law enforcement (ELE) system for Jakarta (DKI) and greater area of Jakarta (Bodetabek).
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • Innovative road/drainage tunnel plan for Jakarta
    February 16, 2015
    An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The