Skip to main content

Jakarta gets ‘vehicle-free’ streets on Sunday mornings

All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels. The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.
May 17, 2012 Read time: 1 min
All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels.

The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.

Related Content

  • Foiled by foliage from Biotecture
    June 27, 2022
    Richard Sabin, managing director of Biotecture*, details how living walls provide an innovative solution for reducing air pollution and improve air quality along congested urban highways.
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Transport plans for Indonesia
    November 28, 2012
    Indonesia’s Government is setting a US$20 billion budget for transport and energy sector development. The Indonesian Government plans to build 559km of new roads as part of a new transport infrastructure programme. Indonesia’s capital Jakarta faces a growing problem due to severe traffic congestion, which is particularly intense at peak periods. Increasing vehicle numbers in the city mean that the existing traffic problem is fast getting worse. The authorities are looking at policies to address the issue.
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot