Skip to main content

Jacobs Engineering Group wins contract to upgrade Scotland’s A9 highway

Jacobs Engineering Group has won the contract to upgrade Scotland’s A9 highway which runs from central Scotland to the far north coast, converting the route into a dual carriageway between Perth and Inverness, one of the busiest sections of the route. Jacobs said that the deal will be “one of the largest road infrastructure projects in Scotland’s history.” This is the second of three design contracts awarded for the project; and it covers 44km of the route including 3km of existing dual carriageway betwee
October 3, 2014 Read time: 2 mins
6726 Jacobs Engineering Group has won the contract to upgrade Scotland’s A9 highway which runs from central Scotland to the far north coast, converting the route into a dual carriageway between Perth and Inverness, one of the busiest sections of the route. Jacobs said that the deal will be “one of the largest road infrastructure projects in Scotland’s history.”

This is the second of three design contracts awarded for the project; and it covers 44km of the route including 3km of existing dual carriageway between the Pass of Birnam and Glen Garry. The Scottish Government estimates the value for each of the three contracts to be £40m to £60m (US$60m to $100m) and the overall construction value for the full 180km-long scheme (of which 124km requires dualling) is estimated at £3 billion ($5 billion).

Under the terms of the contract, Jacobs’ scope of services includes engineering design; statutory procedures; procurement and construction supervision; environmental impact assessment; data management; as well as landowner consultation, and stakeholder and community engagement.

Design principles for the A9 program were developed through the preliminary engineering services commission awarded to Jacobs in September 2012. The project encompasses key features such as crossings over the River Tay, and roadway that runs through National Scenic Areas: the Cairngorm National Park and the Killiecrankie Battlefield.

The entire A9 upgrade scheme is scheduled for completion by 2025.

Related Content

  • Noise and crash barriers, high strength protection
    April 4, 2012
    HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension.
  • Obrascòn Huarte Lain wins Gjønnes Tunnel
    May 28, 2024
    The 1.5km-long long tunnel will be a new county road connection between Gjønnes and E18 at Strand in Norway.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Sao Paulo’s Mario Covas ring road faces last section glitch
    April 10, 2015
    A consortium of Brazil's Mendes Junior and Spain's Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo. The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.