Skip to main content

Jacobs Engineering Group wins contract to upgrade Scotland’s A9 highway

Jacobs Engineering Group has won the contract to upgrade Scotland’s A9 highway which runs from central Scotland to the far north coast, converting the route into a dual carriageway between Perth and Inverness, one of the busiest sections of the route. Jacobs said that the deal will be “one of the largest road infrastructure projects in Scotland’s history.” This is the second of three design contracts awarded for the project; and it covers 44km of the route including 3km of existing dual carriageway betwee
October 3, 2014 Read time: 2 mins
6726 Jacobs Engineering Group has won the contract to upgrade Scotland’s A9 highway which runs from central Scotland to the far north coast, converting the route into a dual carriageway between Perth and Inverness, one of the busiest sections of the route. Jacobs said that the deal will be “one of the largest road infrastructure projects in Scotland’s history.”

This is the second of three design contracts awarded for the project; and it covers 44km of the route including 3km of existing dual carriageway between the Pass of Birnam and Glen Garry. The Scottish Government estimates the value for each of the three contracts to be £40m to £60m (US$60m to $100m) and the overall construction value for the full 180km-long scheme (of which 124km requires dualling) is estimated at £3 billion ($5 billion).

Under the terms of the contract, Jacobs’ scope of services includes engineering design; statutory procedures; procurement and construction supervision; environmental impact assessment; data management; as well as landowner consultation, and stakeholder and community engagement.

Design principles for the A9 program were developed through the preliminary engineering services commission awarded to Jacobs in September 2012. The project encompasses key features such as crossings over the River Tay, and roadway that runs through National Scenic Areas: the Cairngorm National Park and the Killiecrankie Battlefield.

The entire A9 upgrade scheme is scheduled for completion by 2025.

Related Content

  • Design work starts on Inverness West Link Road Project
    October 9, 2012
    The Highland Council in northern Scotland has appointed Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.
  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • Simple road safety measures save lives
    February 15, 2012
    Elementary road safety measures quickly pay back the costs of investment and, more importantly, help save lives as Patrick Smith reports. More than 300 people in the UK are alive today or have avoided the prospect of a lifetime of special care because just 15 roads have had simple improvements put in place.