Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Seittsa set to take on management of bankrupt Spanish motorways
    July 31, 2017
    The Spanish government has given the green light for the state-owned transport infrastructure firm Seittsa to manage nine bankrupt toll motorways. The deal is for Seittsa to prepare the terms for their retender to private companies by the end of next year. Spanish media report that the cost is set to be lower than the €3.5 billion previously estimated by some analysts. The arrangement comes after three years of failed attempts by the government to step in and facilitate debt restructuring between the invest
  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • Sourcing road financing for East Africa’s network expansion
    December 4, 2015
    East Africa’s ambitious road expansion programme is seeing the network expand significantly – Shem Oirere writes The East Africa countries of Kenya, Tanzania, Uganda and Rwanda have announced ambitious road sector expansion plans in the 2015/16 financial year. This is despite their national budgets being weighed down by huge deficits and persisting lack of capacity to spend resources allocated to the sector in previous years. With the huge budget deficits, the countries will have to look for alternati