Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Brazil launches new transport infrastructure investment plan
    August 30, 2012
    The Brazilian government has announced a new transport infrastructure investment plan involving the concession of motorway operations and modernisation of the railway sector. The private public partnerships are predicted to lead to an investment of US$65.68 billion (BRL 133bn) in the next 25 years, including US$ 39.63 billion (BRL 80bn) to be spent in the first five years of the contract.
  • Slovakia: D4/R7 Bratislava bypass work to start early this year
    January 10, 2017
    Construction will start early this year on 59km of highway as part of the D4/R7 bypass of the Slovakian capital Bratislava. Ferrovial through its subsidiaries Cintra Infraestructuras and Ferrovial Agroman is leading the consortium on the public-private partnerships deal worth around €1.9 billion, according to media reports. Ferrovial reached financial close on the project in June, noting that their investment would be around €975 million. The first stage of the design, build, financing, operate and ma
  • Colombia’s La Linea tunnel seeing funding solution?
    October 22, 2014
    The Colombian Government is keen to retart work on the important La Linea Tunnel link. The project has been delayed for a number of reasons and on a number of occasions since it was first envisaged. Engineering firm Valores y Contratos (Valorcon) has now been suggested as a likely candidate to become a strategic partner to join the Union Temporal Segundo Centenario joint venture that will carry out the La Linea tunnel scheme. Valorcon would provide sufficient cash flow US$68 million, either directly or thro
  • Kenya highway work awarded
    October 13, 2020
    An important highway contract in Kenya has been awarded.