Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Norway’s new ‘green’ highway route
    November 13, 2020
    A new route in Norway will provide a faster and greener highway connection between the capital city Oslo and the northern city of Trondheim
  • Major Russian bridge projects underway
    December 13, 2017
    A series of major bridge projects are underway in Russia, in the Krasnodar Region, Novosibirsk and the Surgut District. A new bridge being built in the Krasnodar Region is expected to be open to vehicle traffic at the end of 2018. Work on the bridge supports is being completed at present and work on the deck is now underway. The bridge will also carry rail traffic from the end of 2019. Meanwhile in Novosibirsk, construction is commencing on a new bridge spanning the Ob River. This will be the fourth bridge
  • Key road projects in Venezuela have stalled
    September 15, 2017
    A series of key road projects in Venezuela have fallen victim to the country’s overall financial paralysis, a result of its plummeting economy and its disastrous political climate. Insufficient finances have seen work to construct the La Verota-Kempis, Circunvalacion Sur-Caracas and Caracas-La Guaira highways now being stalled for two years.
  • Vietnam expressway deals
    June 30, 2020
    Key Vietnam expressway deals are now underway.