Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • $6.2 billion Newark Bay Bridge replacement
    July 9, 2025
    The $6.2 billion Newark Bay Bridge replacement project is moving ahead.
  • IBI’s Routemapper charts new territory with Highways England
    September 14, 2016
    Mapping the asset High-speed data collection just got faster for England’s newly created strategic roads operator Highways England’s establishment as a publicly held company in 2015 created a need for a highly accurate asset inventory. This was potentially very costly and had serious safety implications. As well as its relationships with numerous managing agents and contractors, assets include 35,300km of highway, 12,100km of earthworks, 23,200km of safety fences, 150,000 technology assets and sig
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Increased asphalt demand - meeting the challenge
    February 8, 2012
    With demand for asphalt predicted to increase, manufacturers are ready to meet the challenge as Patrick Smith reports