Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Tanzania’s work on East Africa’s multi-national road project
    November 28, 2022
    Tanzania is kick-starting construction work on the missing link in East Africa's multinational road
  • Israel tolled lane projects delayed
    August 10, 2018
    The tender process for the construction of tolled lanes around Tel Aviv now looks set to be delayed. The additional lanes are planned to be built at key points on the network around Tel Aviv in a bid to cut congestion. An earlier project for a tolled lane in the Tel Aviv area, linking the Shappirim Interchange with the centre of the city, has proven highly successful at helping to reduce congestion levels. The three new sections are intended to further improve traffic flow in and around the city. These lane
  • Major fleet
    February 6, 2012
    POLAND'S new A1 highway is the country's biggest road project at present and when complete, it will run 568km north to south from Gdansk to Gorzyczki, cutting the journey time from 10-6 hours. The project is a key one for Poland's economy and the highway will provide a vital new link for cross-country truck transport. This route forms part of the Trans-European Transport route connecting Norway with Greece, and work started in October 2005 on the first 100km phase, which was
  • Australia: Consortium ready to abandon Melbourne’s East West Link
    March 10, 2015
    The East West Connect consortium is set to abandon Melbourne’s East West Link contract in return for a payment of between US$400 million and $535 million, according to media reports. But the Victoria state government is challenging the claim by East West Connect whose partners include Lend Lease, Acciona, Capella Capital and Bouygues. Instead, the government wants East West to payback around $153 million which the consortium allegedly received when the toll road contract was signed, reported the Herald Sun