Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Cleaner engines, reduced emissions
    April 11, 2012
    The forthcoming Tier 4 emissions legislation represents a great leap forward in technology, Mike Woof reports A high-profile focus on sustainability and reduced environmental impact is sweeping the construction sector in the European Union (EU) and the US. The EU and the US will implement regulations for the lowest emission off-road machines in history, with Canada and Japan expected to release similar regulatory programmes this year. The legislation being introduced will transform the construction indu
  • Colombia: New decree allows pension funds to finance 4G projects
    June 25, 2015
    Columbian president Juan Manuel Santos Colombia has said pension fund money could help finance the country’s ambitious 4G motorway projects. Columbia has 35 road projects underway costing more than US$11.7 billion, including the first two 4G tender waves with six public-private partnerships that have already been approved. During a banking convention held in the coastal city of Cartagena in mid-June, Banco Davivienda president Efrain Forero lending capacity studies have been completed for 4GH projects
  • Developments in concrete pavers boosts quality
    July 13, 2012
    The latest technology continues to improve the quality of concrete paving while contractors are also benefiting from more adaptable equipment - Mike Woof reports For many concrete paving applications, versatility is required rather than a high production rate. Leading paver manufacturers such as GOMACO, Power Curbers, Terex and Wirtgen all offer high mobility machines that can be adjusted to cope with an array of tasks. For a contractor, the advantage of these smaller pavers is that they can be configured q
  • Australia highway project underway in Victoria State
    October 5, 2018
    Construction work is now well underway in Australia on the Monash Freeway upgrade in Victoria State. The project has entered its second stage and is costing US$513.5 million (A$711 million. The work involves building 36km of new lanes as well as installing the latest traffic information technology for drivers. For the section from Warrigal Road to the EastLink the router will be widened to five lanes in either direction, compared with four in either direction at present. Meanwhile between Clyde Road and Car