Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Colombian deals
    February 7, 2012
    The Colombian authorities are agreeing terms with the Colombian electricity transmission company Interconexion Electrica (ISA) for the Autopistas de la Montana highway project. The Bogota-Villavicencio highway was also awarded although other infrastructure projects are still awaiting approval.
  • Malaysia's new expressway plans
    March 23, 2012
    The Malaysian Government is giving its approval for a new expressway project. The road link will be built by West Coast Expressway (WCE) and is expected to cost in the order of US$2.32 billion.
  • Environmentalists lose A69 autoroute appeal
    December 12, 2023
    Construction started this year by concessionaire ATOSCA near Toulouse in France but has been halted at times due to protesters invading work sites.
  • Ohio River Crossing tender opening
    November 1, 2021
    The tender process is opening for the Ohio River Crossing.