Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Volvo moves mountains in Portugal
    June 8, 2015
    Volvo Construction Equipment is opening up the remote Portuguese regions of Duoro and Trás-os-Montes for development through one of the largest road tunnels in the Iberian Penninsula. The Túnel do Marão project takes in Portugal’s sixth largest mountain, the Serra do Marão. At a height of 1,415m above sea level, it presents a major obstacle between the country’s second city Porto, located on the coast, and Vila Real near the Spanish border, even since the construction of the winding IP4 highway, built in t
  • Vietnam's new bridge deal
    February 14, 2012
    Funding and assistance from Australia, South Korea and the Asian Development Bank (ADB) will help finance key road and bridge projects in Vietnam.
  • Vandals attack road fittings on key Nairobi road link
    April 24, 2013
    A wave of vandalism has hit a new superhighway from Nairobi as Shem Oirere reports. The newly opened 45km superhighway in Kenya’s capital Nairobi is facing a new challenge that threatens to erode its international standards and compromise the benefits it is meant to generate. A wave of vandalism targeting road fittings has hit the US$360 million highway linking Nairobi to Thika Town, posing a new challenge in the maintenance of the new road infrastructure in Kenya. The destruction delayed the completion of
  • Virginia state issues RFP for $2.1 billion Interstate 66 toll expansion
    December 23, 2015
    The Virginia Department of Transportation (VDOT) has issued a draft request for proposals (RFP) for the US$2.1 billion Interstate 66 tolled expansion project. Work under a 40-50-year public-private partnership is expected to include construction of 46km of lanes.