Skip to main content

Hillhead quarry show sales outlook bullish

The organisers of the Hillhead 2018 quarry exhibition in the UK says that the show’s Main Pavilion is now officially sold out. So far 97% of outdoor space already allocated and stands also selling quickly in the recently extended Registration Pavilion. Event director Richard Bradbury commented, “We have had an overwhelming response to next year’s show both from existing customers wanting to rebook and from new enquiries looking to exhibit with us for the first time. Hillhead 2018 is set to be the largest
December 1, 2017 Read time: 1 min
The Hillhead 2018 exhibition looks to be even bigger than the successful 2016 event

The organisers of the 5894 Hillhead 2018 quarry exhibition in the UK says that the show’s Main Pavilion is now officially sold out. So far 97% of outdoor space already allocated and stands also selling quickly in the recently extended Registration Pavilion. Event director Richard Bradbury commented, “We have had an overwhelming response to next year’s show both from existing customers wanting to rebook and from new enquiries looking to exhibit with us for the first time. Hillhead 2018 is set to be the largest edition to date, hosting more than 500 exhibitors for the first time.”
Visitor registration is already open for the 2018 event which takes place from 26–28 June at Hillhead Quarry, near Buxton.

For more information on companies in this article

Related Content

  • The March of the Urban Low-emission Zone
    April 17, 2018
    Europe’s political patchwork is getting a low-emission zone overlap, according to Malcolm Kent* By now, pretty much everybody in the industry will be aware of the Low Emission Zone in London, UK. But awareness of similar European zones about to start or expand might be more patchy. The background to all of these schemes is the problem of air quality, particularly European Union rules setting limits on acceptable pollution levels. It was found some years ago that several member states’ cities, including
  • Building a car dealership with machine control
    May 21, 2018
    Canadian contractor MB Ford Construction recently built a massive car sales facility in Canada. Meanwhile the highly specialised site preparation job was sub-contracted to another local firm, Rabb Construction. The new Dilawri Auto Mall was a sizeable, heavy civil project on a 6ha site. Rabb needed to level and grade the site for the four car dealer elevated building pads and their surrounding inventory lots and customer parking. The contract included excavating three storm water runoff retention ponds, wh
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a
  • From managed asset to service provider: the future highway
    May 20, 2019
    Every day we hear about Mobility as a Service (MaaS), but what about Roads as a Service? Geoff Hadwick reports from the ERF in Brussels The familiar physical asset called the road will increasingly be seen as part of an emerging global services sector. Given that, the role of the road is changing, notes Christophe Nicodème, general director of the European Union Road Federation (ERF). We need to think much more carefully about planning highway infrastructure in terms of people’s needs, said Nicodème,