Skip to main content

Herrenkencht has developed a novel pipeline installation package

Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
February 6, 2013 Read time: 2 mins
A novel pipelaying system is offered by Herrenknecht
2592 Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the firm and explained, “We can lay pipe up to 1km long in one step. To push the pipe into the ground we have a pipe thruster that can deliver a force of up to 750tonnes.”

The Pipe Express system is controlled remotely from the operating vehicle and there is no need to dig any trenches in advance, reducing personnel requirements and increasing safety. “You can lay pipe directly into the ground,” she said. “With the trench cutter we transport the soil directly to the surface and it’s an economical and efficient method for the pipe laying industry.”

The system can be used in land with a comparatively high water table and in unstable ground, giving it greater versatility than conventional equipment. The surrounding soil structure has minimal disturbance when this equipment is used, while there is no need for complex groundwater lowering. A key feature of this novel approach is the reduced space requirement in comparison with conventional methods using excavators and dump trucks followed by pipelayers, cutting the width required by 70%. This will also reduce installation costs as contractors will have to pay lower land use rates while installing piping. The reduced space requirement is a key point as it will allow pipes to be laid alongside highways for example, while traffic continues to flow. “We think we can lay pipe alongside a motorway for oil, gas, electricity or other utilities,” Rockenstein said.

Stand: C3.415/514

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Herrenknecht.de www.Herrenknecht.de false http://www.herrenknecht.de/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • John Deere Power Systems completes engine line-up
    January 6, 2017
    John Deere Power Systems used bauma to complete its engine line-up for Tier 4 Final/Stage IV emissions regulations. This included the arrival of the PowerTechTM PWL 4.5L engine, which meets emissions regulations without a diesel particulate filter (DPF). Spanning outputs from 63-104kW, this four-cylinder, 4.5litre engine offers reduced cost and improves engine packaging by eliminating the DPF, said Deere. However, the engine uses selective catalytic reduction (SCR), a diesel oxidation catalyst (DOC) and coo
  • John Deere Power Systems completes engine line-up
    April 18, 2013
    John Deere Power Systems used bauma to complete its engine line-up for Tier 4 Final/Stage IV emissions regulations. This included the arrival of the PowerTechTM PWL 4.5L engine, which meets emissions regulations without a diesel particulate filter (DPF). Spanning outputs from 63-104kW, this four-cylinder, 4.5litre engine offers reduced cost and improves engine packaging by eliminating the DPF, said Deere. However, the engine uses selective catalytic reduction (SCR), a diesel oxidation catalyst (DOC) and coo
  • Sennebogen premieres 70tonne telescopic crane
    January 6, 2017
    Sennebogen has plugged the gap in its telescopic crawler crane range with the introduction of the 673R-HD. The 70tonne capacity machine sits between the firm’s 40 and 80tonne models, offering a 36m four-stage main boom with two fly booms of 8m and 15m. This gives a maximum reach of 51m. The 673R-HD is powered by a Stage IIIB/Tier 4 Interim standard Deutz engine delivering 160kW. Telescopic track frames allow for a maximum transport width of just 3m, with fast set-up on site as they extend out to provide sta
  • Sennebogen premieres 70tonne telescopic crane
    April 19, 2013
    Sennebogen has plugged the gap in its telescopic crawler crane range with the introduction of the 673R-HD. The 70tonne capacity machine sits between the firm’s 40 and 80tonne models, offering a 36m four-stage main boom with two fly booms of 8m and 15m. This gives a maximum reach of 51m. The 673R-HD is powered by a Stage IIIB/Tier 4 Interim standard Deutz engine delivering 160kW. Telescopic track frames allow for a maximum transport width of just 3m, with fast set-up on site as they extend out to provide sta