Skip to main content

Herrenkencht has developed a novel pipeline installation package

Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
February 6, 2013 Read time: 2 mins
A novel pipelaying system is offered by Herrenknecht
2592 Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the firm and explained, “We can lay pipe up to 1km long in one step. To push the pipe into the ground we have a pipe thruster that can deliver a force of up to 750tonnes.”

The Pipe Express system is controlled remotely from the operating vehicle and there is no need to dig any trenches in advance, reducing personnel requirements and increasing safety. “You can lay pipe directly into the ground,” she said. “With the trench cutter we transport the soil directly to the surface and it’s an economical and efficient method for the pipe laying industry.”

The system can be used in land with a comparatively high water table and in unstable ground, giving it greater versatility than conventional equipment. The surrounding soil structure has minimal disturbance when this equipment is used, while there is no need for complex groundwater lowering. A key feature of this novel approach is the reduced space requirement in comparison with conventional methods using excavators and dump trucks followed by pipelayers, cutting the width required by 70%. This will also reduce installation costs as contractors will have to pay lower land use rates while installing piping. The reduced space requirement is a key point as it will allow pipes to be laid alongside highways for example, while traffic continues to flow. “We think we can lay pipe alongside a motorway for oil, gas, electricity or other utilities,” Rockenstein said.

Stand: C3.415/514

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Herrenknecht.de www.Herrenknecht.de false http://www.herrenknecht.de/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Verco buckets up to extreme condition mining
    January 6, 2017
    Verco has been supplying buckets for mining in extreme conditions for more than 25 years. Proud members of the HARDOX WEARPARTS network, and with products boasting the logo HARDOX IN MY BODY, Verco specialises in the production of bucket for big excavators and wheeled loaders. The firm also produces wear parts, liners for crushers and recycling equipment.
  • Cifa’s concrete leading position in world market
    March 27, 2013
    Cifa is among the leading worldwide manufacturers of concrete machinery and equipment. The company, under the China-based Zoomlion ownership since 2008, has sales and after-sales networks on all continents. In addition to its range of reliable, high-quality products, Cifa also offers customers financial support through Zoomlion Capital Financial Services.
  • Ormet’s experienced lifting and handling solutions
    April 8, 2013
    The Ormet Group has an impressive 40 years of experience in the world of lift and handling. One of its divisions, Jekko, manufactures high quality self-propelled crawler minicranes, minipickers and vacuum technology. Overmat, another Ormet Group division, manufactures high quality automatic self-propelled mixers for construction and other equipment for handling and logistics of the modern construction site.
  • Verco buckets up to extreme condition mining
    April 9, 2013
    Verco has been supplying buckets for mining in extreme conditions for more than 25 years. Proud members of the HARDOX WEARPARTS network, and with products boasting the logo HARDOX IN MY BODY, Verco specialises in the production of bucket for big excavators and wheeled loaders. The firm also produces wear parts, liners for crushers and recycling equipment.