Skip to main content

Herrenkencht has developed a novel pipeline installation package

Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
February 6, 2013 Read time: 2 mins
A novel pipelaying system is offered by Herrenknecht
2592 Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the firm and explained, “We can lay pipe up to 1km long in one step. To push the pipe into the ground we have a pipe thruster that can deliver a force of up to 750tonnes.”

The Pipe Express system is controlled remotely from the operating vehicle and there is no need to dig any trenches in advance, reducing personnel requirements and increasing safety. “You can lay pipe directly into the ground,” she said. “With the trench cutter we transport the soil directly to the surface and it’s an economical and efficient method for the pipe laying industry.”

The system can be used in land with a comparatively high water table and in unstable ground, giving it greater versatility than conventional equipment. The surrounding soil structure has minimal disturbance when this equipment is used, while there is no need for complex groundwater lowering. A key feature of this novel approach is the reduced space requirement in comparison with conventional methods using excavators and dump trucks followed by pipelayers, cutting the width required by 70%. This will also reduce installation costs as contractors will have to pay lower land use rates while installing piping. The reduced space requirement is a key point as it will allow pipes to be laid alongside highways for example, while traffic continues to flow. “We think we can lay pipe alongside a motorway for oil, gas, electricity or other utilities,” Rockenstein said.

Stand: C3.415/514

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Herrenknecht.de www.Herrenknecht.de false http://www.herrenknecht.de/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Hexagon adds software firm to portfolio
    January 30, 2013
    Hexagon continues to develop its software portfolio with the acquisition of Listech, which will compliment its array of construction solutions and particularly those of its Leica Geosystems subsidiary. Listech offers software solutions that aid with data processing and help streamline workflows in land management, construction and engineering projects.
  • Asphaltica exhibition and conference will provide asphalt road knowledge
    October 31, 2012
    The global economy is still suffering, and many believe investment in road and other infrastructure is the key to its revival Over the past 14 years in Italy, only 187km of new highways have been made, but, at the same time, the amount of vehicles using the country’s roads has grown by nearly 10 million. It is in this context of financial concern and growing burden on existing road infrastructure that the sixth edition of ASPHALTICA, the only European event exclusively dedicated to the world of asphalt, bit
  • Innocrush offers its new Innodrive system
    February 12, 2013
    Austrian mobile crushing and screening equipment manufacturer, Innocrush says its team is constantly striving to develop new and innovative systems that enable customers to achieve the maximum profit with their machines. In 2011 the company presented the dsb Innocrush Innodrive in which the equipment is driven directly without coupling and thus no wear or maintenance-intensive components, says Innocrush.
  • BLS Enterprises is offering new milling machine trackpads
    January 6, 2017
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.