Skip to main content

Healthy bidding for Poland's highway construction

Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
May 14, 2012 Read time: 2 mins
Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin.

The section is 60km long and has been divided by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.

The completion of the tenders is scheduled for May 2010. Meanwhile the authorities in the city of Lublin are opening up the tender process for a road to connect with the city’s ring-road. The project is expected to cost over €52 million. Only up to seven investors will be allowed to take part in the tender.

3302 Budimex 3546 Dromex is starting construction work for the 33km section of Poland’s A4 highway between Debica Pustynia and Rzeszow. The deal is worth nearly €435 million and the contractor, a subsidiary of Polish construction firm Budimex, won the tender with the lowest offer for the work.

Meanwhile contractor 1547 NDI has put in the lowest tender for the 34km section of the A4 between Krzyz and the Debica Pustynia junction. NDI has put in a bid of €251 million while the highest bid for the work was nearly €337 million.

A €200 million loan from the 1054 European Investment Bank (EIB) will provide partial funding for Poland’s highway improvement programme. This loan will be used for upgrading an 8km stretch of the A6 highway between Klucz and Kijewo. The loan will also provide partial funding for construction of a 57km section of the A1 highway between Gorzyczki, Sosnica and Maciejow, as well as a 51km stretch of the A4 highway between Zgorzelec and Krzyzowa. Poland’s highway network has already benefited from EIB loans worth €300 million.

Related Content

  • Poland: Intercor wins S3 dual carriageway contract
    April 2, 2015
    Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Go-ahead for Polish tunnel project
    July 5, 2018
    The tunnel project to connect northern Poland’s Uznam and Wolin islands is now getting the go-ahead.
  • Elevated highway in Vietnam starting construction
    December 12, 2016
    Construction work on a new elevated highway route through Vietnamese conurbation Ho Chi Minh City is commencing. The project involves building a 30.4km stretch of highway, Elevated Road No5, through the busy metropolis and is expected to cost US$785.25 million. The new four lane road will run above National Highway 1A, with the work forming part of a wider project intended to help reduce Ho Chi Minh City’s chronic congestion problems. In all the city’s road transport department plans to construct five of th