Skip to main content

German autobahn project

Construction work is due to commence shortly in Germany on the upgrades to the A8 autobahn in the south of the country.
February 28, 2012 Read time: 1 min
Construction work is due to commence shortly in Germany on the upgrades to the A8 autobahn in the south of the country. The improvements include widening the autobahn to six lanes between Augsburg-West and Neu-Ulm. The project is being carried out under the public private partnership model and the work is due for completion on 30th September 2015. The 41km long autobahn upgrade is expected to cost in the order of €305 million.

Related Content

  • Paraguay’s plan for road rebuilding
    September 30, 2015
    Paraguay’s Ministry of Public Works and Communications (MOPC) will award a series of road projects worth around US$1.3 billion in early 2016. These project include work on the first section of the bi-oceanic corridor, the reconstruction of Route 9, the expansion of Routes 2 and 7 and the second bridge connecting Paraguay with Brazil. The tender process for Route 9 from Remanso Bridge to the city of Mariscal Estigarribia will open shortly and the project is expected to cost around $380 million. The tender fo
  • Costa Rica road projects moving forward - slowly
    July 18, 2017
    Costa Rica is moving ahead with a series of major road projects, but progress is proving slower than anticipated or desired. The Costa Rica Government is struggling to achieve satisfactory progress with its overall road improvement programme. So far the key focus has been on maintaining existing links rather than building and improving road connections. The country’s National Laboratory for Structural Material and Models (Lanamme) has produced a report revealing that 85% of the national roads are in accepta
  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.
  • German highway stretch reopening to be delayed
    February 19, 2019
    Repairs to the A20 highway route in northern Germany are now likely to take longer than initially expected. The route will now take until 2023 to repair, with the work costing some €100 million to carry out and requiring a temporary bridge to carry traffic past the failed section. The temporary bridge accounts for more than half of the cost of the work. The geological problems with the A20 Autobahn route first became visible in September 2018 when a section near Tribsees started to suffer from subsidence.