Skip to main content

Funding for Croatia's road infrastructure

The European Investment Bank (EIB) has approved two loans worth €85 million for Croatia's road infrastructure. The first part of the loan is worth €60 million and will be used for construction of the Corridor Vc highway. The deal was signed between the EIB and Croatian motorways company Hrvatske Autoceste (HAC). The loan will finance 50% of the construction of the Corridor Vc highway. This includes a 12.5km section of the highway along the southern and northern part of the border with Bosnia and Herzegovina
May 8, 2012 Read time: 1 min
RSSThe 1054 European Investment Bank (EIB) has approved two loans worth €85 million for Croatia's road infrastructure. The first part of the loan is worth €60 million and will be used for construction of the Corridor Vc highway. The deal was signed between the EIB and Croatian motorways company 5454 Hrvatske Autoceste (HAC). The loan will finance 50% of the construction of the Corridor Vc highway. This includes a 12.5km section of the highway along the southern and northern part of the border with Bosnia and Herzegovina. The loan has been signed over a 25 year repayment period.

For more information on companies in this article

Related Content

  • Funding agreed for Romanian road construction
    March 22, 2012
    Funding worth some €177.5 million from the European Commission (EC) will pay for a highway construction project in Romania. This non-refundable financing will pay for the construction of a 27.4km stretch of the Lugoj-Dumbrava highway. This section forms part of Lugoj-Deva highway that is itself a part of the Pan-European Corridor IV. The highway section will be built by a consortium formed by the Italian companies Tirrena Scavi, Societa Italiana per Condotte d'Acqua and Cossi Construzioni. Meanwhile moderni
  • IFC to provide consultancy on three-section Corridor Vc works
    May 3, 2013
    JP Autoceste FBiH, the state-owned motorway company of Bosnia's Muslim–Croat Federation, has revealed that the International Finance Corporation (IFC) will provide consultancy for finding a private partner for three sections of Corridor Vc. The IFC consultancy-covered sections are Doboj Jug (Karusa)-Medakovo (4km); Medakovo-Ozimica (21km); and Ozimica-Poprikusa (13.7km). The consultancy deal will last for a period of 15 months during which a due diligence of costs and a study for the three Corridor Vc secti
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.