Skip to main content

FTA delighted with €500million plus boost to NI transport infrastructure

An imminent €500million plus cash injection into Northern Ireland transport infrastructure will lead to lower fuel costs, quicker journey times and greater overseas investment, according to the Freight Transport Association (FTA).
March 15, 2012 Read time: 2 mins
RSSAn imminent €500million plus cash injection into Northern Ireland transport infrastructure will lead to lower fuel costs, quicker journey times and greater overseas investment, according to the 3934 Freight Transport Association (FTA). Among Government funded investment will be €125.2million for the A8 from Larne to Belfast. The FTA has been a vocal supporter of long-time plans to dual the congested 14km stretch of single carriageway, which is one of Northern Ireland’s most vital trade routes. Tom Wilson, FTA’s head of policy for Northern Ireland, said: “The A8 is a strategically significant trade route, but one which has lacked capacity to cope with the sheer volume of lorries relying on this route to reach Larne Port. "It is an absolutely essential link in our supply chain between businesses on the island of Ireland and large freight hubs in northern England and Scotland. This funding will go a long way to improve Ireland's connectivity and finally make the A8 fit for purpose." The A8 has been the unfortunate setting for many fatal road traffic accidents owing to the lack of safe overtaking opportunities along it. "Typically, slower-moving agricultural vehicles do cause long tailbacks on this road and motorists do take risks when overtaking tractors, combine harvesters and the like," said Wilson. "Dualling will reduce instances of risky overtaking." This week’s announcement by Sammy Wilson, Minister for Finance, will also see €393.5million spent on upgrading the A5, which links the north west of Northern Ireland to Eire. During his unveiling of the transport infrastructure investment plan, Wilson said: "Better roads and infrastructure will not only encourage investment from overseas and overall connectivity, but also mean lower fuel costs and more reliable journey times, giving hauliers, local businesses and motorists alike a welcome boost."

For more information on companies in this article

Related Content

  • MIRA builds on reputation for transport excellence
    October 3, 2012
    MIRA in central England has begun a huge redevelopment of its 830 acre site that will see the renowned centre for transport technologies expand its capabilities while, at the same time, create the largest transport research and development technology park in Europe. Guy Woodford reports This is all very impressive,” said Deputy Prime Minister Nick Clegg in April 2011 on hearing a presentation of MIRA’s ambitious expansion plans. As succinct appraisals go, Clegg’s view of MIRA’s plans to develop its brand of
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • Key road infrastructure developments in Australia’s South Australia and New South Wales states
    July 25, 2018
    A major road infrastructure development is being put forward in South Australia. A 14km-long bridge is being proposed that would connect Kangaroo Island with the mainland. The bridge has an estimated pricetag of US$3.7 billion (A$5 billion). The proposals call for a PPP project, with tolls on the four lane bridge helping to pay for its construction. However with a population of under 5,000, there are questions as to whether there would be sufficient traffic between Kangaroo Island and the mainland to make t
  • Another US$94.08mn for repairs to Hammersmith flyover in London
    June 14, 2013
    A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.