Skip to main content

Frost-heave a problem on Norwegian roads

Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but
May 8, 2012 Read time: 1 min
Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (1208 Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but says measures are being taken to make improvements. These include more collaboration with universities and internal training. Highway E18 between Krosby and Knapstad, E16 between Wøyen and Bjørum and a section of trunk road 2 are among those most affected by frost-heaving.

For more information on companies in this article

Related Content

  • Russia seeks outside investment in road building
    November 6, 2012
    The Russian road building industry is on the verge of big changes as it bids to improve quality and speed of construction says Eugene Gerden The Russian road building industry is on the verge of big changes as the national government considers creating conditions to attract foreign companies to build roads in the country. According to a recent order of President Vladimir Putin, due to poor quality and high cost of road construction, there is a need for the development of a mechanism to attract foreign compa
  • TRA2012 attracts over 1,600 delegates
    June 25, 2012
    More than 1,600 people took part in four days of transport research topic discussion at the TRA2012 conference in Athens, Greece. The event between 23rd-26th April included a special focus on infrastructure, with large numbers of FEHRL (Forum of European National Highway Research Laboratories) members taking part in different sessions.
  • TRA2012 attracts over 1,600 delegates
    May 3, 2012
    More than 1,600 people took part in four days of transport research topic discussion at the TRA2012 conference in Athens, Greece. The event between 23-26 April included a special focus on infrastructure, with large numbers of FEHRL (Forum of European National Highway Research Laboratories) members taking part in different sessions. One key strategic session titled ‘Infrastructure for the 21st century’ was moderated by Hans Jeekel (Rijkswaterstaat) and featured Marit Brandtsegg from Statens Vegvesen (NPRA) a
  • Tunneling finished for Norway’s Trøndelag tunnel project
    September 27, 2018
    Skanska reports that it has completed the bore and dynamiting for the Strømnes-Sprova tunnel project in the Norwegian county of Nord-Trøndelag. The nearly €40m project, which was awarded to Skanska in August last year,is for 5.4kn of new road, including both the 600m Holmvik and the 1km Strømnes tunnels. Two bridges are also being built, the 42m Holmviksbron and the 27m Eldbron. Norwegian roads authority Statens Vegvesen appointed Skanska to project which is part of an upgrade to the Dyrstad-Sprova-Ma