Skip to main content

Frost-heave a problem on Norwegian roads

Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but
May 8, 2012 Read time: 1 min
Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (1208 Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but says measures are being taken to make improvements. These include more collaboration with universities and internal training. Highway E18 between Krosby and Knapstad, E16 between Wøyen and Bjørum and a section of trunk road 2 are among those most affected by frost-heaving.

For more information on companies in this article

Related Content

  • The new agile world of the construction equipment industry
    June 22, 2015
    while worldwide for 2015 a crystalball would be helpful, in Europe the sector has already listed specific priorities it wants to tackle, and among these are the upcoming emissions regulations (see separate story), external trade and access to foreign markets, and market surveillance.
  • Ambitious road tunnelling projects around the world
    November 29, 2013
    The construction of the world’s longest subsea road tunnel in Norway and a vital new link under the Bosphorus Strait in Turkey are among a host of exciting, major road tunnel-based projects currently being undertaken across the globe. Guy Woodford reports Sandvik DTi series tunnelling jumbos are being used for the excavation of Solbakktunnel, set to become the world’s longest subsea road tunnel.
  • Road markings and microplastics
    February 2, 2024
    Recent regulations from the European Commission have exempted road markings from microplastic bans and restrictions, at least for the moment, explains to the ERF.
  • Kapsch tolling for Norway’s Ryfast Tunnel
    March 19, 2021
    Kapsch’s multi-lane free-flow G3 tolling system began operating in the tunnel since February 1.