Skip to main content

Four offers for Sibiu-Pitesti A1 motorway Lot 4 section

Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
September 4, 2019 Read time: 2 mins

Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway.

The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction.

The bidders are from China, Turkey, Austria and Italy.

Lot 4 runs nearly 11km from Curtea de Argeș to Tigveni.

The 576km A1will connect the capital Bucharest with the Banat and Crișana regions in the western part of the country, running in a south-east to north west direction. It connects the major cities of Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

The motorway is built along the Trans-European Transport Networks Rhine-Danube Corridor and so reportedly receives 85% funding from the 1116 European Union.

For more information on companies in this article

Related Content

  • All roads lead to Dubrovnik: Corridors for Shared Prosperity
    December 13, 2018
    The European Union Road Federation is organising, in cooperation with the International Road Federation (IRF), the Croatian Roads Company (Hrvatske Ceste), the Croatian Road Association (Via Vita) and the University of Zagreb, the European Road Conference under the theme Corridors for Shared Prosperity in the iconic city of Dubrovnik, from 22 to 24 October 2018 Due to its privileged geographical position, Croatia represents a key crossroads in the connectivity of the South East Europe region, securing a
  • Romania receives upwards of 20 tenders for Craiova-Pitesti highway
    November 2, 2017
    Romania’s National Company for the Administration of Road Infrastructure has received 20 tenders for two segments of the Craiova-Pitesti highway.
  • Work to start on section of Bulgaria’s controversial Struma road
    August 19, 2016
    Work will start next month on a 24km section of Bulgaria’s controversial Struma Highway, part of the the Pan-European Corridor IV. Corridor IV runs from Dresden in Germany to Istanbul in western Turkey. The route, named after the Struma River, is part of Е79 that runs from Miskolc in Hungary to the Greek Aegean port of Thessaloniki, passing through the Romanian cities of Deva and Craiova. The 156km route has been under construction in four sections, with work on the third and final section now abou
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp