Skip to main content

Four offers for Sibiu-Pitesti A1 motorway Lot 4 section

Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
September 4, 2019 Read time: 2 mins

Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway.

The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction.

The bidders are from China, Turkey, Austria and Italy.

Lot 4 runs nearly 11km from Curtea de Argeș to Tigveni.

The 576km A1will connect the capital Bucharest with the Banat and Crișana regions in the western part of the country, running in a south-east to north west direction. It connects the major cities of Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

The motorway is built along the Trans-European Transport Networks Rhine-Danube Corridor and so reportedly receives 85% funding from the 1116 European Union.

For more information on companies in this article

Related Content

  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.
  • Loan for Bosnia motorway project
    May 9, 2019
    A loan agreement has been signed to help pay for a new motorway project in Bosnia and Herzegovina. The European Bank for Reconstruction and Development (EBRD) is providing the Bosnia and Herzegovina Government with a loan worth €210 million for next stage of Corridor Vc project. According to the EBRD, Bosnia and Herzegovina’s further economic integration with the Western Balkans and the rest of Europe will take an important step forward due to this loan for. The development of Corridor Vc is a strategic
  • Romania building new road and highway links
    July 19, 2016
    Romania’s road building programme is moving forward, but perhaps more slowly than the country’s National Company for Highways and Roads (CNADNR) would prefer. At present a total of 733km of highways are open to use in Romania, but new sections measuring up to 260km in all should be ready for traffic by the end of 2017. A further 22km of the A1 highway connecting Orastie with Sibiu is expected to open in the third quarter of 2016. The Deva to Lugoj stretch of the A1 has also to be completed, while a section