Skip to main content

First public outing for Liebherr tower crane at INTERMAT

Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
January 6, 2017 Read time: 2 mins
718 Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane.

The 380tonne unit tops the 15-model range, which starts from 50tonnes.

The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.

The 380 EC-B 16 superstructure can be fitted to both Liebherr’s IC or HC tower systems. The IC towers are 1.9 x 1.9metres and the climbing system allows it to climb both on and inside a building. With the IC tower system, the free-standing hook height can be almost 70m, while on the HC tower system that increases to almost 85m.

Speeding assembly are Liebherr’s ‘Connect and Work’ quick-action connections for the jib and counter-jib, LiConnect jib connections and electrical plug-in connections for the drives and switchgear.

There are slip-resistant catwalks on the jib and counter-jib along with safety railings where needed.

A four-chord counter-jib enables five trucks to transport the complete superstructure with each individual part able to fit into a container.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.liebherr.com Liebherr website false http://www.liebherr.com/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Ausa launches C 250 H rough-terrain forklift at INTERMAT 2012
    January 6, 2017
    The two Ausa forklifts shown at INTERMAT will feature the company’s FullGrip drive technology, which enables alternate use of 4x4 and 4x2, by pressing a button on its single-control joystick.
  • Ausa launches C 250 H rough-terrain forklift at INTERMAT 2012
    February 3, 2012
    The two Ausa forklifts shown at INTERMAT will feature the company’s FullGrip drive technology, which enables alternate use of 4x4 and 4x2, by pressing a button on its single-control joystick.
  • Sateco launches lift shaft podium
    January 6, 2017
    Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na
  • Sateco launches lift shaft podium
    April 12, 2012
    Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na