Skip to main content

Sateco launches lift shaft podium

Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na
January 6, 2017 Read time: 2 mins
Sateco is unveiling its new lift shaft podium at Intermat 2012.
3202 Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells.

Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor nails. The lift shaft podium can be extended from a square platform measuring 1.6m x 1.6m to a large format rectangular platform measuring 2.5m x 2.6m, in steps of 1cm length and 5cm width.

Fully foldable and collapsible, making it easy to transport, the podium is delivered with foldable access ladder with integrated safety bow for fitting between floors.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.sateco-coffrages.com</span> Sateco false http://www.sateco-coffrages.com/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Sateco launches lift shaft podium
    April 12, 2012
    Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na
  • Sateco claims world formwork first
    January 6, 2017
    Sateco says its new detensioning spacer unit is a world first for the construction industry. The product is fitted with a side nut that acts as a valve, releasing the force acting on the formwork rod after concrete has dried. When the side nut is manoeuvred, the detensioning spacer unit is moved, thus releasing the pressure acting on the main nut. The main nut is then easier to unscrew, allowing faster and less strenuous form removal. Product designers at France-based Sateco came up with the detensionsing s
  • Sateco claims world formwork first
    April 12, 2012
    Sateco says its new detensioning spacer unit is a world first for the construction industry. The product is fitted with a side nut that acts as a valve, releasing the force acting on the formwork rod after concrete has dried. When the side nut is manoeuvred, the detensioning spacer unit is moved, thus releasing the pressure acting on the main nut. The main nut is then easier to unscrew, allowing faster and less strenuous form removal. Product designers at France-based Sateco came up with the detensionsing s
  • Ausa launches T 235 H telehandler at INTERMAT 2012
    January 6, 2017