Skip to main content

Fiat Industrial renews 3-year committed revolving credit facility

Fiat Industrial has signed the renewal of a US$2.69 billion (€2bn) three-year committed revolving credit facility with 21 banks. The deal is said by Fiat Industrial to demonstrate the strong support the Group enjoys from its key relationship banks. The facility is intended for general corporate purposes and working capital needs and replaces the US$2.69 billion three-year revolving credit facility originally signed in December 2010.
February 8, 2013 Read time: 1 min
6892 Fiat Industrial has signed the renewal of a US$2.69 billion (€2bn) three-year committed revolving credit facility with 21 banks.

The deal is said by Fiat Industrial to demonstrate the strong support the Group enjoys from its key relationship banks. The facility is intended for general corporate purposes and working capital needs and replaces the US$2.69 billion three-year revolving credit facility originally signed in December 2010.

For more information on companies in this article

Related Content

  • Beijing construction exhibition will break records
    February 16, 2012
    BICES organisers say a growth in the number of exhibitors, space and scope of the 2011 event assure it of success As the new US$33 billion Beijing-Shanghai 300km/hour bullet train swings into action the organisers of BICES 2011 are also claiming a world-class success. They say that the 11th Beijing International Construction Machinery Exhibition & Seminar 2011 has achieved what it planned with a 25% growth from the previous event (2009) in the number of exhibitors and floor space.
  • Decarbonising the construction industry
    October 26, 2023
    Decarbonising the construction industry can yield rewards.
  • Hannes Norrgren appointed Volvo Penta Industrial president
    August 31, 2022
    Hannes Norrgren is taking over as president of Volvo Penta Industrial.
  • Montreal’s new Champlain Bridge is in a race against time
    June 8, 2018
    Montreal’s US$3.24 billion Champlain Bridge across the St Lawrence River may not be open on time, according to a report by the independent Auditor General. The 3.4km cable-stayed bridge has two decks supporting three lanes of highway traffic in each direction. A third, central deck supports a mass transit system and a multi-use path. The new bridge will replace the nearby 50-year-old Champlain Bridge which has been deteriorating at an alarming rate. The government signed a contract in 2015 with a private