Skip to main content

FCC and ACS of Spain to take part in tender for UK’s Mersey bridge project

Spanish construction companies FCC and ACS say they will take part in the tender of the US$3.05 billion (£2bn) Mersey bridge project in the UK. FCC and ACS will take part as members of two of the three consortia that have expressed an interest. FCC will take part in the tender through its German subsidiary Hochtief, and it infrastructures division Iridium, within the consortium led by BAM Nuttal of the UK. Meanwhile, ACS will be part of the Bilfinger and Macquarie consortium through its subsidiary Globalvia
May 22, 2013 Read time: 1 min
Spanish construction companies 4914 FCC and 917 ACS say they will take part in the tender of the US$3.05 billion (£2bn) Mersey bridge project in the UK.

FCC and ACS will take part as members of two of the three consortia that have expressed an interest. FCC will take part in the tender through its German subsidiary 981 Hochtief, and it infrastructures division Iridium, within the consortium led by 3137 BAM Nuttall of the UK.

Meanwhile, ACS will be part of the Bilfinger and 2378 Macquarie consortium through its subsidiary 1377 Globalvia. The third consortium bidding for the contract includes 979 Bouygues of France in association with 1146 Balfour Beatty from the UK. The project involves the construction and management over 30 years of the 2.13km Mersey bridge.

For more information on companies in this article

Related Content

  • Hochtief buys out Bilfinger to take control of Herren Tunnel Lubeck
    March 14, 2016
    Global infrastructure group Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger. The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments. A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel
  • Ramboll appointed independent engineer on Champlain Bridge Project
    September 8, 2015
    Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31