Skip to main content

Eurovia success in Hertfordshire, England contracts bid

Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts. The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.
October 11, 2012 Read time: 2 mins
3281 Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts.

The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.

Eurovia has also been selected as one of four companies for the Eastern Highways Alliance (EHA) of local authorities Framework, comprising the councils of Hertfordshire, Cambridgeshire, Suffolk, Norfolk, Luton, Bedford, Central Bedfordshire, Essex and Southend on Sea. The four-year framework deal started on 28 May 2012 and is expected to be worth up to $ 120 million (£75mn). Hertfordshire itself expects to put $ 6.4 million (£4mn) worth of work each year through the framework.
The works will be led by Eurovia Infrastructure from the company’s base in Enfield, North London.

Neil Huntington, Eurovia Infrastructure director, said: “The fact that we are the only company to be recognised in this way is a testament to the breadth of the in-house capability within Eurovia. It also recognises our reputation for quality, value for money and collaborative delivery which minimises disruption to local residents and businesses.”

For more information on companies in this article

Related Content

  • Fugro wins 3-year pavement assessment contract with UK council
    December 13, 2012
    Fugro has secured a three-year contract with Luton Borough Council in southern England to provide a range of highway and footway investigations, including the Council’s annual SCANNER surveys using Fugro’s ARAN (Automatic Road Analyser) survey system. The survey package also includes SCRIM (surface friction) testing of Luton’s A, B and C roads, and CVI (coarse visual inspection) of unclassified roads. Cambridge-based Fugro transport specialists will process the survey data to generate NI (national indicator
  • Balfour included on major UK Highways Agency framework contract
    November 7, 2014
    Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer