Skip to main content

Eurovia success in Hertfordshire, England contracts bid

Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts. The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.
October 11, 2012 Read time: 2 mins
3281 Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts.

The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.

Eurovia has also been selected as one of four companies for the Eastern Highways Alliance (EHA) of local authorities Framework, comprising the councils of Hertfordshire, Cambridgeshire, Suffolk, Norfolk, Luton, Bedford, Central Bedfordshire, Essex and Southend on Sea. The four-year framework deal started on 28 May 2012 and is expected to be worth up to $ 120 million (£75mn). Hertfordshire itself expects to put $ 6.4 million (£4mn) worth of work each year through the framework.
The works will be led by Eurovia Infrastructure from the company’s base in Enfield, North London.

Neil Huntington, Eurovia Infrastructure director, said: “The fact that we are the only company to be recognised in this way is a testament to the breadth of the in-house capability within Eurovia. It also recognises our reputation for quality, value for money and collaborative delivery which minimises disruption to local residents and businesses.”

For more information on companies in this article

Related Content

  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w
  • UK government to invest in M5 and M6 motorways
    July 9, 2013
    The UK government is planning to make improvements to the M5 and M6 as part of its US$150.41 billion (£100bn) infrastructure spending programme. Changes will include motorists being allowed to drive on the hard shoulder, with computerised signs being installed to inform them when it is safe to do so. The Government has also confirmed that it will provide funding for a new link road between the M6 Toll and the M54, while $8.94 billion (£6bn) will be put towards repairing roads and $5.96 billion (£4bn) will b
  • Beyond cost: forging a solutions-led partnership for highways carbon-saving
    December 30, 2024
    Changing highways procurement is increasingly focusing material specification to drive carbon savings as well as cost. A longstanding partnership between Huyton Asphalt and Tarmac is delivering new solutions for highways clients in the UK.
  • Recycling advances from Wirtgen
    June 18, 2012
    German firm Wirtgen is retaining its lead in road recycling technologies – Mike Woof writes Tests on cold recycling with a new layer thickness using Wirtgen's sophisticated WR 4200 machine have shown impressive results according to the firm. The road construction and traffic authority Landesbetrieb Mobilität (LBM) Cochem-Koblenz commissioned a pilot project as part of its plan to optimise the cold in-place recycling process (CIR). The aim was to examine the extent to which the layer thickness can be reduced