Skip to main content

Environmentally friendly demolition of famous US Bay Bridge to take years

While the new eastern span of northern California’s Bay Bridge between San Francisco and Oakland will open to traffic this September, the task of taking down the old eastern bridge span roadway is likely to take years. Speaking to a local TV station Brad McCrea, regulatory director of the Bay Conservation and Development Commission, the state agency that oversees protection of the Bay Area, said: “Taking the old Bay Bridge [eastern span roadway] down is as practically as big a project as putting the new one
March 18, 2013 Read time: 2 mins
While the new eastern span of northern California’s Bay Bridge between San Francisco and Oakland will open to traffic this September, the task of taking down the old eastern bridge span roadway is likely to take years.

Speaking to local TV station KPIX 5 Brad McCrea, regulatory director of the Bay Conservation and Development Commission, the state agency that oversees protection of the Bay Area, said: “Taking the old Bay Bridge [eastern span roadway] down is as practically as big a project as putting the new one up.”

Environmental restrictions mean the existing structure will have to be carefully taken apart in sections, in the reverse order that it was originally built.

“They have great documentation about how this old structure was built in the 1930s. So they will use the architectural drawings from the 30s, they’ll use all of the photographs they have from the 30s, and they’ll use that as a road map to un-doing what was done 75 years ago,” explained McCrea in his TV interview.

The new eastern span of the Bay Bridge, a near 3km long continuation of the Bay Bridge crossing, will run on from a small island in the middle of the bay where the two suspension bridges of the western half make landfall. The route passes through this Yerba Buena Island, in a short tunnel.  A new single-span single-tower suspension bridge, with a 385m main span, is the centrepiece of the new eastern Bay Bridge span. It will cross the main east side shipping channel close to Yerba and its adjoining Treasure Island naval base, carrying five lanes of traffic each way. The road continues on the long curving Skyway concrete viaduct for the following 2.1km. A final touch down section takes motorists on to Oakland.

The US$6.3 billion renewal of the eastern Bay Bridge is seen as a long-term solution to renowned seismic activity in the area.

Related Content

  • Helsinki approves the Crown Bridges – Kruunusillat - project
    September 22, 2016
    Helsinki City Council has approved construction of the Crown Bridges – Kruunusillat – Project, that at 3km will be the longest bridge in Finland. The bridge will carry pedestrians, cyclists and trams between the city centre and the 143 hectare Kruunuvuorenranta development to the east which will have over 580,000m² of residential space and 6,000 housing units. The centrepiece of the €259 million scheme, as designed by WSP Finland and Knight Architects, will be the 1.2km span crossing of the main bay,
  • Saudi Arabian capital Riyadh benefiting from major transport investment
    September 9, 2013
    Saudi Arabia is undergoing a series of upgrades to its transport network in a bid to improve Traffic flow rates and boost safety - Mike Woof reports. The massive growth in the use of motor transport worldwide since the start of the 20th century has transformed every country on the planet. But perhaps no country has changed more dramatically than Saudi Arabia, the world’s leading oil producer. At the start of the 20th century Saudi Arabia’s population was small and the country had few industries while it is
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Bridge drainage solution prevents water damage
    February 10, 2012
    Pipeline & Drainage Systems (PDS), is pointing to its EnviroDeck drainage product saying that unless properly drained, water can cause severe damage to bridges, particularly on deck surfaces where it may become trapped.