Skip to main content

EIB lends €900mn for Poland’s S7 and S8 dual carriageways

Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
December 14, 2012 Read time: 1 min
Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the 1054 European Investment Bank (EIB).

The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.

For more information on companies in this article

Related Content

  • Strabag closes in on Poland’s S8 Marki-Kobylka contract
    August 19, 2019
    Strabag has nudged into the lead for Poland’s retender of the dual lane S8 section between the Marki and Kobylka junctions, previously held by Salini-Impreglio. Five offers were on the table for the deal with Strabag offering €38 million, well above the €32 million that was budgeted for by GDDKiA, Poland’s road authority. Other bids came from a consortium headed by Warszawskie Przedsiebiorstwo Mostowe Mosty at nearly €40 million, a PORR and Unibep consortium offere at almost €59 million, a bid by I
  • Strabag wins Poland S7 dual carriageway tender
    June 17, 2014
    Strabag consortium has won a tender for the construction of a 4.5km S7 dual carriageway section in the eastern part of Krakow, Poland. The investment will also include the construction of a bridge over the Vistula River. The gross value of the offer made by Strabag reached almost €127.93 million (PLN 529 million), which is less than the budget of the investor set at PLN 610.3 million. In total nine offers have been submitted in the tender. All bidders offered a ten-year guarantee and a 27-month deadline.
  • PBDiM and Gulermak start on Warsaw's ring road
    June 26, 2017
    Work has started on the 18.5km southern ring road around the Polish capital Warsaw.
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru